Chain Manufacturing Process

Raw Material

All bar stock is sourced from approved mills, dedicated to Zheng Mao, in accordance with the Classification Society Approval Procedures. Chemical composition is verified using a fully automatic atomic emission spectrometer.

 


Bar Cutting

All raw material bar stock is checked before entering the production process to ensure compliance with the purchase order requirements in terms of dimensional tolerance, chemical analysis and mechanical properties. Material is then cut to predetermined link lengths, depending upon chain type (stud link or studless).



Heating

Each link is heated by electric means, either via induction (as shown) or resistance method, using state of the art techniques, which are closely controlled and monitored. The correct forging temperature is important so as to maximise the mechanical integrity of the link, optimising the performance characteristics of the finished product.

 

Bending

Each link is bent over a mandrel specifically designed for the size and type of chain being manufactured. Link dimensions and alignment are checked regularly to verify the accuracy of the tooling as well as the actual chains in manufacture.


 

Welding

Each link is transferred via carousel to the flash butt welding station whereby electric current is passed through copper clamps to heat the link to specific welding temperature, ensuring maximum penetration and welding efficiency.




Trimming

Excess weld or “flash”, is then removed from the link by automatic process using special trimming tools which create a smooth, flush finish around the weld area. This is important to ensure there is no possibility the link could foul against adjacent equipment (windlass or fairleader) or precipitate a stress fracture within the link.



Stud Setting,  Link Sizing and Stud Welding

Studs are placed in the link, which is then pressed onto the stud so that there is a good, snug fit, minimising the possibility of stud movement during deployment and use. Studless links are pressed to the correct size to give a uniform shape to prevent the chain from twisting or snagging either when lifting into the chain locker or in a permanent mooring application.
If necessary, studs are welded in accordance with established techniques and procedures. Strict welding control minimises the risk of fatigue related cracking and subsequent link failure.

Heat Treatment

All Zheng Mao heat treatment plants are computer controlled, with a full range of treatments, including normalising, water quench, oil quench,“double quench” and tempering. The metallurgical structure of each link is closely controlled to achieve the mechanical properties specified by the customer or Classification Society.



Proof and Break load Test

Every link of chain is tested on one of 3 linear test beds, with a maximum capacity of 20,000kN, which means that we can offer chains in a full range of sizes, grades and continuous lengths. All testing processes are closely monitored by the in-house inspection team, as well as the relevant Classification Society.

Shot Blasting

Performed prior to NDT to ensure surface cleanliness and maximize efficiency of MPI, UT and visual inspection process.





Metallurgical Test

Chain specimens are subjected to full mechanical testing procedures to check tensile strength, impact resistance etc in accordance with Classification Society requirements. Grain size, distribution and inclusions are checked by microscopic examination.




Non Destructive Test and Final Inspection

Highly skilled and fully qualified engineers perform a complete set of Magnetic Particle Inspection (MPI) and Ultrasonic Tests (UT) to optimize the physical integrity of each link.

Trial Fit

We ensure compatibility of all interfacing components prior to dispatch to ensure there are no costly problems during installation or operation.





Painting and Coating

Whilst it has been proven that painting or coating offers no notable benefit in terms of preservation or corrosion resistance, we can paint and/or color-code the chains to client's specific requirements.





Packaging and Dispatch

Safe packing and handling are essential for a smooth loadout, with certified twist free bundles to facilitate subsequent discharge and installation on site.

 

Application Selector

Mooring Category

Product/Group

Application

Offspring International Products Offspring International Services Latest Case Studies Latest News Useful Links

Head Office UK
Unit 1, Oak Street, Quarry Bank, Brierley Hill
West Midlands, DY5 2JH
Tel: +44 (0) 1384 415540
Fax: +44 (0) 1384 415544

Branch Office
Offspring International Ltd
26941 Cabot Rd Ste 105
Laguna Hills, CA 92653, USA
Tel: + 1-949-916-8282
Fax: + 1-949-916-8383

© Offspring International Limited 2009 | Terms & Conditions | Privacy Policy